Goliath Fall 2016
Verification & Validation Test Plan and Matrix
By: Diana Nguyen (Mission, Systems, and Test Engineer)
Approved by Kristen Oduca (Project Manager)
Table of Contents
Introuction
As we got close to a finish produce we began to do testing on Goliath. By testing each requirement we were able to see if we truly design Goliath again our requirements that we had been developing. The process of testing takes a long time and you would be surprised how many you can do without a completed project. I recommend when testing do as many as possible as your team continues to work towards the final project.
Verification Matrix
The verification matrix is essential our test plan but it covers the main points of your test. This allows you to quickly skim through what test you have completed and the results of the test.
Test Plan
Our test plan can be downloaded on from this link. Verification Test Plan
Conclusion
We have been developing our requirements the entire semester and it is important to see if we have been following them. After running test plans you can see why requirements need to be quantitative and not qualitative. It is very hard to test if something is “small” or general. In addition, it is ok if you do not pass all your requirements. However, do aim to pass as many as possible.