#15: Final Information Filing
Assignments and Due Dates
Additional Information
Do Not Forget
Verification Report
- Updated and Printed Verification and Validation Checklists and associated Test Reports are Due at the time of the Demonstration. Verification will be at the L1 level (minimum) and L2 on a time available basis. Request waivers on tests you are not planning on conducting. It never hurts to ask.
- Provide link to PDR System Level Requirements Do not include unlinked requirements. In other words, a system level requirement which is not linked to a project requirement. Again, unless approved, subsystem verification is not factored into your grade.
- Include a “Change Control Page” at the beginning of the Test Report. See SMD Pick and Place for excellent example.
- Common mistakes: quantitative (no sharp edges), missing requirements (flight time, safety).
- Checklist may include percent complete versus a simple Yes or No.
- Grading Note(s)
- Points deducted for use of glue gun and other adhesives like epoxy, twisted non-soldered wires, poor workmanship, tape, zip ties, etc.
- Non-mission Critical Parts
During the final week of class (not during final’s week) teams will return parts on loan or purchased with University funds and not required in support of the demonstration. Please bring paper versions of all relevant emails and receipts to expedite the process.