Spring 2018 3DoT Hexy: Work Breakdown Structure
By: Eduardo De La Cruz (Project Manager and Manufacturing Engineer)
Approved by: Miguel Garcia (Quality Assurance)
Introduction
Below is the Work Breakdown Structure (WBS) for our project. The diagram is broken down into task each division engineer will be responsible for in the production of the final product. These assignments are based of the task matrix we developed as a class. Engineers can use this diagram as a reference for what they need to do. For a more detailed explanation of what each task consists of, consult the task matrix.
Figure 1: Work Breakdown Structure
Eduardo De La Cruz – Project Manager and Manufacturing Engineer
Due to having only three members per group, the Manufacturing Engineers of each group was assigned the task of project manager. Therefore Eduardo will be responsible for completing all the manufacturing and managerial task to ensure mission success.
The task shown above are broken down into top level task. All task that fall under each top level task will be the task each engineer will be accountable for. Top level task are organized in the order of priority. Therefore,
Top level task:
As Project Manager Eduardo will have to:
- Prepare the project planning documentation
- Prepare all design documentation
- Project Launch Documentation
As Manufacturing Engineer Eduardo will have to:
- Create the Mechanical Drawings.
- PCB layout
- Design the 3D Models.
- Manufacture Parts and Assemble final model.
For specific details on what each task contains, see the work breakdown structure chart.
Kris Osuna – Electronics and Control Engineer
Kris Osuna will be responsible for designing, programming, and for doing all research for the hardware we will be using. His top level task are organized in order of priority:
Top level task:
- Electronic Design
- Trade Studies/Research
- Microcontroller and PCB
- Programming/Control
For specific details on what each task contains, see the work breakdown structure chart.
Raymundo Lopez Santiago – Mission, System, and Testing
Raymundo Lopez Santiago’s top level task will be to work on the system design, software, and hardware testing.
Top level task:
- System Design
- Software (for Arxterra interfacing)
- System Testing
For specific details on what each task contains, see the work breakdown structure chart.